- Problems found in the vendor shop are cheaper to fix than at site.
- Use an inspection and test plan with hold and witness points.
- FAT confirms performance before shipment.
Vendor Shop Inspection and FAT: Protecting Equipment Quality
A factory acceptance test (FAT) and vendor shop inspection help owners catch equipment problems before they reach the site, where fixes cost far more.
Step 1: Agree the Inspection and Test Plan
The ITP lists every inspection, test, hold point and witness point.
Step 2: Material and Fabrication Checks
- Material certificates
- Welding procedures and welder qualifications
- NDT results
- Dimensional checks
Step 3: Witness the FAT
The FAT may include hydrotests, mechanical run tests, performance tests or logic tests.
Step 4: Release for Shipment
Confirm preservation and packing before release.
Why Inspect at the Vendor's Shop?
Fixing a defect at the vendor's shop may take days. Fixing the same defect at site can take weeks, needs special tools and may delay mechanical completion of a whole unit. Shop inspection also gives the owner confidence that the equipment is built to the agreed specification, using the right materials and qualified welders.
For critical equipment such as compressors, reactors, heat exchangers and control systems, inspections are usually planned at several stages of fabrication, not only at the end.
Typical Factory Acceptance Tests
- Hydrostatic tests for vessels and exchangers
- Mechanical running tests for pumps and compressors
- String tests for compressor trains
- Integrated FAT for DCS and safety systems
- Valve seat leakage and stroke tests
Recording Results
Every inspection should end with a signed report listing results, deviations and agreed corrective actions. These records become part of the equipment's quality dossier and support future maintenance.
Grow Gas Vendor Supervision
Grow Gas provides vendor workshop supervision during construction.
Frequently Asked Questions
What is the difference between FAT and SAT?
A factory acceptance test (FAT) is done at the vendor's shop before shipment. A site acceptance test (SAT) is done after installation at site.
Who attends the FAT?
The vendor, the contractor and the owner or its inspection representative normally attend, with third-party inspectors where required.
What happens if equipment fails the FAT?
The vendor must correct the problem and repeat the failed tests before the equipment is released for shipment.
Conclusion
Whether you are planning a new project or improving an existing plant, getting these details right protects people, assets and production. Contact Grow Gas at info@growgas.com to discuss how our engineering and operations team can support your plant.